Installation Nearly Complete At Japanese Automotive Manufacturing Plant In San Antonio
Return
Miner Central Texas is putting the finishing touches on an installation at Texas’ newest automotive manufacturing plant. Production is scheduled to begin in 2006, and all of the material handling equipment is in place to begin receiving shipments.
In addition to designing a specialized loading dock system, the Miner team has been working to ensure smooth product movement within the interior of the facility with the installation of many types of specialty doors. These doors will play a critical role keeping up with a fast-paced environment, controlling temperatures and maintaining clean air environments.
The project has definitely shown the value of team work as the local Miner San Antonio office pulled up their boot-straps and completed this project on time!
In addition to designing a specialized loading dock system, the Miner team has been working to ensure smooth product movement within the interior of the facility with the installation of many types of specialty doors. These doors will play a critical role keeping up with a fast-paced environment, controlling temperatures and maintaining clean air environments.
The project has definitely shown the value of team work as the local Miner San Antonio office pulled up their boot-straps and completed this project on time!


